PETROC COLLEGE BARNSTAPLE, DEVON

Liberty Centre ACCESS Path

We were instructed by Petroc to install a new tarmacadam access path, with bollard lighting, at the Sticklepath campus to comply with DDA requirements. The 120 metre long path was installed in less than two weeks and involved the formation of ramps to either end including the removal of wooded areas and hedgerows and existing timber steps in order to facilitate the works.